Tuesday, March 9, 2010

I got a random text about this thing again






I built this burm for a Red Bull soap box derby race 3 years ago. Every 6 month somebody brings it up randomly. Weird This thing was designed and built in three weeks. I did the yeah no problem, then took the deposit and winged it. Pulled it off. It cost them a shit load. But they re-used it last summer in LA. Man that thing was a bitch. 1000 plus pieces of 1/2" black pipe and 70plus sheets of expanded steel. I buit the thing thinking that it had to be skateable, and it was. The end

1 comment:

Pastime said...

Man it was nerve-wracking loading that thing on the semi!